The Al Nuaimi Group has grown significantly over the last 35 years in to a major, integrated construction group working across the UAE. Started in 1974 in Ras Al Khaimah, the Group is owned by its Chairman, Mr Abdullah Ahmed Al Nuaimi, and operates through its seven divisions—Building Construction (1974), General Transport (1974), Ready Mixed Concrete (1976), road building (1981), foundations and piling (2005), aluminium (2008) and application engineering (2008).

Founded in 1974, the Al Nuaimi Group Construction Directorates are leading construction builder in Ras Al Khaimah (RAK). Among the projects completed by this division is the abjar tower for Mr. Abdullah A. Al Nuaimi, the Federal Electricity & Water Authority Offices and the 10-storey RAk Chamber of Commerce building in Ras Al Khaimah, the Arabian Automobiles Showroom in RAK, 50 low cost houses in Fujairah “Qurayyah” for the ministry of public works in Abu Dhabi and four deluxe villas for Mr. Abdul Wahab Karo’a.

In 2007, Al Nuaimi Group (Ready Mix Division) & Al Nuaimi Foundations were merged to form Al Nuaimi Foundations & Concrete. At the same time, the company modernized its operations and improved its plant and equipment by importing the latest technology in this field and by adopting a quality management system complaint with ISO9001: 2008. Today, it has two plants in Khor khuwair, 2 plants in Al Qusaidiat, 1 plant in Jazeerah Al Hamra & 1 plant in Alain. Over the years, Al Nuaimi Ready Mix has grown to become one of the largest producers of high quality Ready Mix in UAE, particularly in R.A.K, with a complete range of mobile Plants, ready to serve any project. Among its successes can be listed the Hilton beach club at Ras Al Khaimah, tower links golf club, Al Jazeerah port, Hilton Beach Hotel and Resorts – Chalets and the Arabian Health Care Private Hospital.

The roads and laboratories Division has been involved in many major road projects since its inception in 1981. These have included roads in Ras Al Khaimah, Sharjah, Fujairah and Ummul Quwain, including maintenance, improvement and development of Al Qasr Rd (Fujairah), maintenece, improvement and development of the Fujairah- Khorfakkan Highway and internal roads in Fujairah.

The latest additions to te group structure are the Aluminium Division and the Application Engineering Division, both created in 2008. The former is intended to be a one-stop partner for all kind of architectural metal and glass fabrication works, while the latter is one of the most advanced companies in the field of manufacturing and automating plants and consequently is very technology oriented. It also manufactures full batching plants in UAE.

Today, the Group is recognized as a regional leader in the construction industry for both its strength in traditional construction and for its ability to incorporate the latest cutting edge technology. It is known for its quality and innovation. With a strong client base across the UAE in both the public and private sectors, Al Nuaimi has created a strong base from which to move forward over the next few years. Despite the current difficult economic climate, the Group has been and continuous to be involved in some prestigious projects, including The RAK Mall (Lulu Hypermarket) and the RAK Chamber of commerce in Ras Al Khaimah (both currently under construction) the Abjar Tower, the twin Tower and the flex Tower. Looking at the future, The Group has already significantly expanded its operations within UAE and is now looking to move to the wider GCC countries with the stated aim of becoming one of the leading quality construction groups right across the GCC and UAE.